Your situation

I have bought it

The house is yours and nothing works the way it did at home. The electricity certificate, the air conditioning, the mosquito screens: eight trades, and one of them you need before the meters can be put in your name.

125 listings 19 towns8 trades in this stage

Trade
Town
Clear filters

Every pin is a listing from an official register. When the exact address could not be placed, the pin sits near the centre of the town and the listing says so.

6 listings

Official registerBestdesign Cocinas e Interiores S.LAvda de las Habaneras 67 · Torrevieja
Bestdesign Cocinas e Interiores S.L
Furniture packs
Registro Mercantil, sheet A 205522
Official registerDual Acento S.LC/ Vicente Aleixandre 31 - Urb. Torreta Florida · Torrevieja
Dual Acento S.L
Furniture packs
Registro Mercantil, sheet A 196483
Official registerIzum Comodo S.LC/ Apolo Número82 · Torrevieja
Izum Comodo S.L
Furniture packs
Registro Mercantil, sheet A 192839
Official registerLaniakea Retail S.LC/ Madamme Curie 50 · Torrevieja
Laniakea Retail S.L
Furniture packs
Registro Mercantil, sheet A 204240
Official registerMateria Studio Interiors S.LAvda Gregorio Marañon 37 - local F · Torrevieja
Materia Studio Interiors S.L
Furniture packs
Registro Mercantil, sheet A 197409
Official registerUrban Capsules Group S.LUrb Balcon de Boletín Oficial del Registro Mercantil Núm. 41 Lunes 2 de Marzo de 2026 Pág. 10856 Torreblanca Número70 · Torrevieja
Urban Capsules Group S.L
Furniture packs
Registro Mercantil, sheet A 203805

See the trade page: Furniture packs

The order they turn up in

  1. 11Authorised electricianThe installer registration number issued by the Generalitat Valenciana. An electrician without it can do the work but cannot sign the certificate.
  2. 12PlumberFor gas work, a separate certification. A plumber is not automatically a gas fitter, and a gas appliance signed off by the wrong person voids the house insurance.
  3. 13Air conditioning and heat pumpsThe RITE certification for refrigerant gases. Without it the installation cannot legally be signed off, and it is the paperwork an insurer asks for after a fire.
  4. 14Solar panelsThat the quote includes the legalisation and the connection agreement, not only the panels, and whether your urbanisation rules allow them on that roof.
  5. 15Locksmith and alarmFor an alarm connected to a monitoring centre, the company must be registered with the Ministry of the Interior. A camera you watch yourself does not need that, and does not give it either.
  6. 16Mosquito screens, blinds, pergolas, metalworkFor anything fixed to the outside, ask whether the community rules and the town hall allow it. A pergola taken down again is the most expensive one there is.
  7. 17Furnishing the whole houseThat the quote lists every room and every item, and who carries the risk if the completion date moves. It usually moves.
  8. 18Painter, kitchen and bathroomFor anything structural, a licence from the town hall, and a quote with a date. In this area the second is harder to get than the first.

Read the full guide for this stage

Not sure who you need?

Tell us what you are looking for

Pick a trade, pick a town, and see the real listings straight away. We only ask for your address at the end, if you want the list kept.

Free. Nothing is asked of you before the results.

The letter

About once a month: what changes in the paperwork and the costs of a home on the Costa Blanca, and the newly added trades.